For their project at Dover Castle the local authority combined with English Heritage have chosen to use the Apex Elite railing system with its unique gothic style post design and railings constructed using an impressive expansion technique that forms solid joints to each vertical without any welding.
Each panel is then connected to the post using heavy duty invisible fixing blocks that locate internally providing neat clean joints to match the panel assembly.
The railings and matching gates are galvanised prior to being long term ERP 1 coating system resin coated black suitable for this project.